| Project Name | : | ANTACO BINH DUONG - SPECILIZES IN FABRICATION & INSTALLATION PREFABRICATED BUILDING |
| : | XDCT-03 | |
| Work Items | : | ANTACO Binh Duong is a contractor specilizing in fabricating & installing prefabricated building in swine, poultry and dairy farm owned by CJ, Japfa, Greenfeed, Viet Thang. |
| : | 4717 | |
| | ||
ANTACO Binh Duong is a contractor specilizing in fabricating & installing prefabricated building in swine, poultry and dairy farm owned by CJ, Japfa, Greenfeed, Viet Thang.
Introduction about Prefabricated building in Breeding Farm:
Because of saving material for heavy duty base frame, Prefabricated Building is cheaper than other Steel Building. Especially, it’s suitable to use in low-rise with 60 m in width and 30 m in height such as warehouse, farm,…
Moreover, Prefabricated building is used pre-designed joint and prefabricated material. Therefore, it helps saving time to design, fabricate and install.
Advantage:
- Weight is lighter than other material, helps reducing load pressure;
- Saving auxiliary materials;
- Installing easily, quickly, not depend on weather;
- Making best use of warehouse space;
- High synchronism;
- Expanding easily;
- Saving time and money.
Introduction about An Tam Mechanical Plant:


Location: Khanh Binh ward, Tan Uyen town, Binh Duong province
Land area: 34,000 m2
Building area: 20,000 m2
Work Scope:
- Design – Fabrication – Installation of Steel Structure for
- Factory projects, Warehouses, Farms…
- Fabrication of Support frame, Platforms…
Capacity: 15,000 tons / year

Warehouse 1

Warehouse 2
Fabricating steel structure:




Installing prefabricated building:










Finishing inside:




Finishing outside:

